THE CASE OF THE UNRULY SPIDER
Second, the magnaflux mark was not clearly legible on all the pieces. Before Jones had a chance to go to the receiving department to examine the pieces. he received a telephone call from the production superintendent demanding immediate replacement of the parts because they were holding up the shipment of a substantial spare parts order. The parts were needed for a foreign shipment.
As soon as he got a chance, Jones went to the receiving department and examined the spider gears. He called to the attention of the chief inspector the fact that there was no notation on the drawing calling for any finish on the bore of the three holes. This dimension called for an extremely tight tolerance of 0.0004-inch. All the parts met this requirement when measured with an inside micrometer. However, he could see that the inside surface of these holes was slightly rough from the boring operation. Jones did not feel that this roughness was adequate grounds for rejection; however, he suggested that the inspector call the engineer responsible for the part to see if it would be possible to use the part.
A meeting was quickly arranged with the engineer, who took one look at the spiders and said that they were absolutely unsuitable for use. The dimension he objected to was a bearing seat. The engineer said that he could not afford to take a chance on a fit that could become loose in service. He felt that any respectable supplier would produce a smooth surface on this type of hole without any notification on the drawing. He felt that the rough surface showed inferior workmanship. The engineer refused to accept the parts as they were and suggested that the supplier prepare new ones with a ground finish on the bores. Jones asked the engineer to add a suitable finish indication on the drawing, so the supplier would know exactly what finish was required. This indication would give the inspection department a definite standard for inspection. The request was refused because the engineer felt that any good subcontractor would immediately identify the holes as bearing seats and would produce a 64-micro-inch finish without any special note. Moreover, these parts had been in production for several years and he had never experienced this trouble before; the engineer felt that a new supplier was causing the trouble.
Allen Jones put a telephone call to Mr. Speed of the Speedy Tool Company and described the situation to him. Mr. Speed objected strenuously to the rejection based on the rough finish. He said that he had been furnished a plug gauge to check this dimension and that the parts had all been checked satisfactorily with this gauge before they had been shipped. Nothing had ever been said to Mr. Speed about the necessity for a ground finish on the bores. Since the holes were already at the proper dimension, it would be impossible to grind them further to salvage the 32 units without an expensive chrome plating operation. Mr. Speed agreed to change his procedure in the future, so that these holes would have a ground finish. The fixture for this operation would cost at least $2,000, and Speed felt that he would probably have to spend about $25 a unit for additional labor in the grinding operations.
In regard to the magnaflux marking, Mr. Speed pointed out that the marking stamp had been furnished by the Alex Company and that the drawing called for it to be applied to a curved surface. Mr. Speed agreed that it was not very legible, but said that it was the best they could do under the circumstances without damaging the stamp.
Mr. Speed said that he was able to make the new grinding operation effective on 100 pieces that were in process and thought that he could deliver these within a week.
185
The Speedy Tool Company was a major supplier of production tooling, particularly dies, jigs, and fixtures. The two companies had had a very favorable relationship for ten or twelve years. Mr. Speed called on Mr. Jones about once a week in regard to the many items of tooling which were on order, and the two men had come to know each other very well. Speedy Tool had done very little production work for Jones, but its precision work on tooling had always been well done and it had a very good delivery and quality record.
The spider had become active at the time of the introduction of the Alex offset press. It had been necessary to subcontract this item because no facilities were available internally. At that time, the drawings, specifications, and gauges were furnished to the original subcontractor, the Wilson Automatic Machine Company. Wilson had built the original tooling. When Alex had dropped this press from the product line, the part had become inactive. A demand had only recently occurred for spare parts. Jones had found that Wilson had virtually gone out of business on subcontract precision work. In fact, he had had considerable difficulty in getting the original gauges and tooling back from the Wilson Company. Speedy had quoted based on tooling to be furnished, but when the tools had been received from Wilson, they were found to be in very poor condition. In fact, some of the tooling had not been modified to bring it up to the marked revision of the drawing. It had been necessary for Mr. Speed to spend over $25,000 in repairing the tooling before he could use it.
Allen Jones was puzzled as to the action he should take. He did not think it would be completely fair to Speedy to reject the thirty-two units, because he felt that Alex Precision Manufacturing Company had some responsibility for the loss. He also knew that Mr. Speed had spent considerably more than he had anticipated on being adequately tooled for the job. He was debating in his own mind the advisability of permitting Mr. Speed to raise the price to compensate him for this change in circumstances.
1. What are the sources of this problem?
2. What do you think would be an equitable solution to the problem?
186